Shepi Canal First Lateral Canal and other improvement projects

Date :2023-11-10 Issued byPingtung Management Office

Basic information

  • Organizer:
    Pingtung Taitung Management Office, Irrigation Agency
  • Construction period:
    2022-04-27~2022-04-27
Content

This was originally a control work channel which was in serious disrepair, collapsed and had no safety guardrails. However, it is adjacent to the North and South Canals in Wandan Township and has frequent traffic. As a result, a concrete rectangular ditch was dug to improve the Canal, and block guardrails installed on both sides, to improve water delivery and maintain traffic safety

(Completion date April 27, 2022.)